Power failure and damage at Osaka factory

The powerful typhoon that ripped through Osaka yesterday has caused widespread damage and blackouts. Unfortunately our main Osaka factory remains un-operational due to power failure and water damage. Regrettably no jobs can be processed during the next 24-48 hours as the damage is repaired and power reconnected. Any orders placed […]